The 42 km pipeline will range in diameter from 2–12 inches, passing through swampy terrain and will include a major river crossing.

Article continues below…

The pipeline will transport 30 MMcf/d of gas from the fields to a gas processing plant, which will be constructed by Daewoo Engineering and Construction Co. The processed gas will then be transported through the Escravos – Lagos Pipeline System.