During the next two years, BJ is contracted to provide swabbing, air-drying, nitrogen purging and packing, and caliper survey services on the 95-km long, 28-in diameter, main oil and gas pipelines, the 95-km long, 18-in, fuel gas trunk lines, and associated 18-in and 6-in infield lines.