CPPEC completed the crossing of the Ailikaite River, the last of 28 river crossings on the project, ahead of the wet season.

The Line IV expansion project involves the construction of a 14 inch, 325 km pipeline, which runs parallel to the existing Multi-Product Oil Pipeline from Nairobi to Eldoret.

CPPEC was awarded the construction contract in 0ctober 2009 and the pipeline is scheduled to be completed by mid-2011.