no_access SEKCO Oil Pipeline — Pipelines International — The international pipeline magazine
A Great Southern Press Site
Username:   Password: Forgot Password?
Advanced Search.

SEKCO Oil Pipeline

Planned
Onshore & Offshore

North America
Gulf of Mexico
United States

Southeast Keathley Canyon Pipeline Company

The proposed 240 km, 18 inch diameter SEKCO crude oil gathering pipeline is located in the deepwater Gulf of Mexico, the United States.

The SEKCO Oil Pipeline is being designed with a capacity of 115,000 bbl/d and would serve the Lucius development area in southern Keathley Canyon, which is estimated to have more than 300 MMboe with relatively shallow and highly productive reservoirs, primarily comprised of crude oil.

The pipeline would connect the Lucius-truss spar floating production platform to an existing junction platform at South Marsh Island 205 that is part of the Enterprise-operated Poseidon pipeline system.

The pipeline will be constructed and owned by Southeast Keathley Canyon Pipeline Company (SEKCO), a 50-50 joint venture between Enterprise Products Partners and Genesis Energy. Enterprise will serve as construction manager and operator of the new pipeline, earning fees for both services.

The SEKCO Oil Pipeline is expected to begin service by mid-2014.


Crude oil
240
18

115,000 bbl/d


-



Related articles

· Partnership sees genesis of crude oil pipeline Tue, 17 January 2012

Legend
cf
: cubic feet
cm
: cubic metres
t
: tonne
B
: billion
MM
: million
bbl
: barrel
MW
: mega watts
boe
: barrels of oil equivalent
/d
: per day
/a
: per annum
GJ
: giga joules
psi
: pounds per square inch
TJ
: tera joules
PJ
: peta joules
EJ
: exa joules
: Celsius

Enter your details here to subscribe to the free Pipelines International Update.

Add to Jobs newsletter.
I would like to receive exclusive discounts and invitations to industry events and other relevant items.

Please enter the word in the image below:

Basket is empty.